Featured White Papers
- 9 critical reasons to automate performance management (SuccessFactors, Inc.)
- Aug. 28th: Delivering Online Presentations That Result in Higher Sales (Citrix Online)
- The missing link: Driving business results through pay-for-performance (SuccessFactors, Inc.)
Manufacturing Industry
Kaiser Downey MOB 1, Downey, CA: new seismic requirements prompted Kaiser Permanente to build its Kaiser Downey Medical Center Replacement Hospital project next door to the existing Imperial Medical Offices.(PROJECT INNOVATIONS)
Buildings, October, 2006
The first building completed on the campus was the 4-story Medical Office Building 1. Special Design Features Designers worked with Kaiser's stringent templates and building standards to create a pleasing aesthetic using surface-plane changes, color, and materials. Bright colors and various forms on the exterior transform the required metal stud-and-plaster wall system.
Public areas capture large quantities of natural light and display colorful patterns of finish materials. Patient safety was also increased by the design of same-handed configurations in all ...
Read the rest of this article with a Free Trial at HighBeam Research.