Manufacturing Industry

GE WIND TO INSTALL 3.6-MW TURBINES FOR IRISH PROJECT.

Advanced Materials & Composites News, June, 2003

June 13, 2003 - GE Wind Energy says that Irish firm Airtricity has chosen it to supply the first seven 3.6-MW turbines to the Arklow offshore project, located 6.25 miles (10 kilometers) off the east coast of Ireland. The turbines are expected to be operating by the end of 2003.

Airtricity says that it hopes to eventually install up to 200 turbines on the site, making it the largest offshore project in the world at the time.

GE Wind Energy has developed its huge 3.6-MW wind turbines specifically for offshore applications. The rotors are more than 328 feet (100 meters) in diameter. GE erected the prototype in Spain in September, 2002.

W) http://www.gepower.com/dhtml/wind/en_us/index.jsp

Premium Content Partnership | HighBeam Research provides an in-depth online archive library of reference works. HighBeam Research

 

BNET TalkbackShare your ideas and expertise on this topic

Please add your comment:

  1. You are currently: a Guest |
  2.  

Basic HTML tags that work in comments are: bold (<b></b>), italic (<i></i>), underline (<u></u>), and hyperlink (<a href></a)

advertisement
advertisement
  • Click Here
  • Click Here
  • Click Here
advertisement