Verizon Expands Its Green Energy Program in Tampa, Fla., by Installing 140 Solar Panels at Company's Carrollwood Central Office
U.S. Newswire, November, 2007
To: ENVIRONMENTAL EDITORS
Contact: Bob Elek of Verizon, 1-813-483-2541, bob.elek@verizon.com
TAMPA, Fla., Nov. 7 /PRNewswire/ -- Evidence of Verizon's commitment to alternative methods of energy production will soon become obvious to residents in northwest Hillsborough County as Verizon nears completion of the installation of 140 solar panels at its Carrollwood central office building on Zambito Road.
The solar project is another example of Verizon's national commitment to green energy practices that include pursuing network equipment and building energy-reduction initiatives; utilizing alternative energy sources in the network, buildings and vehicle fleet; developing a fleet of hybrid vans and service vehicles; and promoting the company's technology as an...
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- Design a commission plan that drives sales - Sales Commissions
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article
- LIFO vs. FIFO: a return to the basics


