Manufacturing Industry
Power Authority Plans System Plug In.(Plug Power Inc. receives Long Island Power Authority contract)(Brief Article)
Fuel Cell Technology News, May, 2002
The Long Island Power Authority (LIPA, 333 Earle Ovington Blvd., Uniondale, NY 11553; Tel: 516/222-7700) will begin the installation of 17 Plug Power, Inc. fuel cells at several commercial and municipal customer locations on Long Island this summer.
The 5-kW fuel cells will be interconnected to LIPA's grid and will operate in a combined heat and power mode, providing electricity and heat on site at select LIPA customer locations. Operation of the systems, which will be powered by natural gas, will enable evaluation of the integration of fuel cells at the specific point of need.
By the end of 2002, LIPA also will install three 5-kW DC backup power systems, operating on hydrogen, at facilities on Long Island. This will allow an initial assessment of fuel...
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- LIFO vs. FIFO: a return to the basics
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article
- Design a commission plan that drives sales - Sales Commissions


