Cooling the historic Palmer House Hilton.(Field Solutions)(The Palmer House Hilton)(Company Profile)
Air Conditioning, Heating & Refrigeration News, November, 2004 by Hanks-Checket, B.
CHICAGO -- The Palmer House Hilton hotel boasts a history few other U.S. hotels can match. It also holds a special place in the hearts of the HVACR community; it is the regular meeting site for the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) whenever the winter meeting takes place in Chicago, now every three years.
The grand hotel got an air conditioning upgrade this year thanks to Team Mechanical Inc. (TMI, Buffalo Grove, Ill.), which installed a new cooling tower. The equipment had to be helicopter lifted onto the roof of the 24-floor hotel.
TMI worked with manufacturer's rep Maddock Industries to purchase the new $250,000, 112,000-pound Marley Cooling Technologies cooling tower. That was the easy part....
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- LIFO vs. FIFO: a return to the basics
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article
- Design a commission plan that drives sales - Sales Commissions


