Manufacturing Industry
FERC staff gives REX East initial EIS clearance.(Washington watch)
Underground Construction, January, 2008 by Barlas, Stephen
In late November, the staff at the Federal Energy Regulatory Commission (FERC) published a draft environmental impact statement essentially clearing the proposed Rockies Express East (REX) project, slated to run 639 miles from Wyoming to Monroe County, OH. When completed, it would be the last and third leg in the 1,679-mile Rockies Express Pipeline System, which will deliver gas to eastern and northeastern markets allowing them, theoretically, to reduce their dependence on Gulf Coast gas.
The FERC staff conceded that the REX East segment would have considerable environmental impacts, but that the joint venture's proposed mitigation measures plus those suggested by the FERC, if they are accepted, would be enough to limit any permanent damage, although the draft...
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- LIFO vs. FIFO: a return to the basics
- Design a commission plan that drives sales - Sales Commissions
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article


