Transportation Industry
Rail switch machine
Railway Track and Structures, Dec, 2004
The Process Rail Switch from Process Switch Co., LLC, features easy set up. Operate the integral hand pump to move the track to the desired positions, then press a button for three seconds and the throw point is locked into the system's memory. An exclusive electro-hydraulic power pack is used to move the rail points. There are no hoses or fittings to leak or rupture. Trailing will not damage the switch. Phone: 206-255-0688.
[ILLUSTRATION OMITTED]
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- LIFO vs. FIFO: a return to the basics
- Design a commission plan that drives sales - Sales Commissions
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article


