40 systems to invest $US 24.7 billion
40 Systems To Invest $US 24.7 Billion
Total in $US million is based on exchange rates prevailing on February
24 2003
ALGERIA
Algerian National Railways (SNTF)
System length: 3866km
Period covered: 2003
Dinars million
Locos 1,128.33
Shunters 1,553.24
Rolling stock refurbishment 626.68
Workshops & depots 489.25
Other 161.84
TOTAL 3,959.34
Total in $US million: 49.68
AUSTRALIA
Australian Rail Track Corporation (Track Authority)
System length: 3535km
Period covered: July 2002 to June 2003
$A million
Major track improvements 9.58
Signalling & train control 0.23
TOTAL 9.81
Total in $US million: 5.87
BELGIUM
Belgium National Railways (SNCB)
System length: 3454km
Period covered: 2003
Euros million
Rolling stock 284.64
Major track improvements 125.71
Track maintenance machinery 12.54
Electrification 30.65
Signalling & train control 50.30
Telecommunications 32.93
Passenger station equipment 61.70
Freight yard equipment 66.27
Workshops & depots 40.61
Other:
bridges & structures 45.16
information technology 43.29
TOTAL 793.80
Total in $US million: 858.16
BOLIVIA
Andina Railway (FA)
System length: 2200km
Period covered: 2003
$US million
Diesel locos 1.20
Loco-hauled coaches 0.10
Freight wagons 0.12
Major track improvements 1.70
Telecommunications 0.08
Passenger station equipment 0.06
Workshops & depots 0.03
TOTAL 3.29
BOSNIA
Bosnian Railways (ZFBH)
System length: 608km
Period covered: 2003
Euros million
Self-propelled coaches--9 56.24
Major track improvements--10km 5.20
Track maintenance machinery 8.15
Signalling & train control (8 3.28
stations)
Freight yard equipment 3.87
Workshops & depots 0.69
TOTAL 77.43
Total in $US million: 83.70
BRITAIN
Northern Ireland Railways (NIR)
System length: 328km
Period covered: April 2003 to March 2004
[pounds sterling] million
Rolling stock (third tranche) 11.00
Major track improvements 2.00
Signalling & train control 10.00
Telecommunications 1.00
Passenger station equipment 3.00
Workshops & depots 7.00
TOTAL 34.00
Total in $US million: 54.14
CAMEROUN CFA
Camrail (Cameroon Railways)
System length: 1016km
Period covered: 2003
CFA Fr million
Rolling stock refurbishment 4,416.60
Major track improvements 14,124.70
Track maintenance machinery 162.10
Telecommunications 23.00
Passenger station equipment 259.00
Workshops & depots 264.60
Other 50.00
TOTAL 19,300.00
Total in $US million: 31.80
CANADA
Canadian National Railway
System length: 21, 185km
Period covered: 2003
$C million
Rolling stock 150.00
Infrastructure improvements 500.00
Special projects including capacity
increases 200.00
Other 150.00
TOTAL 1,000.00
Total in $US million: 666.67
VIA Rail
System length operated over:
12,955km
Period covered: 2003
Loco-hauled coaches 66.00
Rolling stock refurbishment 10.00
Major track improvements 5.00
Signalling & train control 2.00
Passenger station equipment 7.00
Workshops & depots 4.00
Other:
information services 5.00
miscellaneous 2.90
TOTAL 101.90
Total in $US million: 67.72
CHINA
Kowloon-Canton Railway Corporation--East Rail
System length: 34km
Period covered: 2003
$HK million
Diesel locos 84.00
Self-propelled coaches--12-car emu 118.00
New through train 36.00
Rolling stock refurbishment 27.00
Electrification 8.00
Signalling & train control 15.00
Passenger station equipment 50.00
Workshops & depots 61.00
Other:
noise abatement and stabilisation 77.00
stations 215.00
office furniture etc 7.00
TOTAL 698.00
Total in $US million: 89.49
DENMARK
Railion Denmark (Freight Operator)
Period covered: 2003
Krone million
Other:
combined terminal investment (inc
cranes, bogie equipment, safefy
devices, shunting machines) 33.50
TOTAL 33.50
Total in $US million: 4.87