Rooms-to-Go distribution center, Lakeland, Florida: a giant undertaking
Concrete Construction, Dec, 2002
The Rooms-to-Go concrete tilt-up project faced a number of unique challenges due to its size, the Florida heat, and a scarcity of water. In addition, the project required a crew of 60, working in all phases of the concrete construction process--placing foundations, forming and pouring slabs and panels, erecting panels, and patching--all at one time. The more than 40 main slab placements consumed an average of 600 yards of concrete per day, 6 days a week--a final total of more than 38,000 cubic yards of concrete.
In the intense Florida heat, a steel measuring tape tends to expand as the day heats up, so intermediate control points were set to maintain accuracy in measurement of the slabs on grade and panels.
During slab and paving placements, the aggregate bins were being drained daily. The volume of concrete being placed each day left little time for the ready-mix supplier to restock and properly wet down the aggregate. Having a strong relationship with the ready-mix supplier helped to minimize these problems. The building subbase was sand, which created a challenge in maintaining proper moisture content. The crew hauled water long distances from the building to wet cure the slab.
A high-speed transport lane, which was placed 6 months after the original slabs, began cracking at the load-transfer dowels. This was a result of concrete shrinkage in the new lane after shrinkage in the main slab had long since ceased. The contractor switched to a PNA diamond-plate dowel system, which allowed for side-to-side movement of the newly placed lane, thereby minimizing cracking.
The final building, 1,650,000 square feet with 479 tilt-up panels, is more than 1.5 miles around.
PROJECT PARTICIPANTS
* Contractor: Seretta Construction, Orlando, Fla.
* Project Superintendent: Alfredo Garcia, Orlando, Fla.
* Project Manager: Andrew S. McPherson, Vice President, Orlando, Fla.
* Owner/Developer: Seaman Development Corp., Duluth, Ga.
* Ready-Mix Producer: RMC Ewell Industries, Lakeland, Fla.
Most Recent Business Articles
- How do I determine my retainer fee?
- Why fly solo when an executive assistant can accelerate your CLNC® business?
- The CLNC® mentors held the key to my first case and to my CLNC® success
- Atlanta CLNC® 6-day certification seminar photo galleryplus sign up today for spring 2009 to save $100.00
- Speak to a full-time practicing CLNC® consultant
Most Recent Business Publications
Most Popular Business Articles
- Using object-oriented analysis and design over traditional structured analysis and design
- Big Fish Games Migrates Upstream to Fisher Plaza; High Growth Online Gaming Firm Vaults Fisher Plaza Occupancy Rate Above 90%
- Top of the line: some of the world's most well-respected doctors practice in South Florida. A guide to choosing the best physician specialists - Top Doctors in South Florida
- Sand filter basics: high-rate sand filters can be confusing for those new to the business. Understanding valve modes is the key
- BEHR Paints Introduces a Colorful New Way to Paint and Prime All in One with BEHR Premium Plus Ultra™ Interior
Most Popular Business Publications
Content provided in partnership with http://findarticles.com/source//