Eagle Plains' Copper Canyon Property adds 2.8M oz Gold, 37M oz Silver and 1.1B lbs Copper to NovaGold's Galore Creek Project
Market Wire, January, 2005
As part of the current work on the project, Hatch Ltd. has been retained to complete a Pre-Feasibility level study on Galore Creek that integrates the new resources from West Fork, Junction, Copper Canyon along with an updated main Central/Southwest deposit resource. The study will look at increased yearly production levels for the project and will refine estimates for capital and operating costs, as well as look in more detail at site layout, metallurgy, resource optimization scheduling, and development timelines. The results of this work will be available in the second half of 2005 and will guide the Feasibility level engineering programs for the project.
Work will concurrently proceed with further environmental studies for the Galore Creek Environmental Assessment Report which is being completed by RTEC the joint company comprised of Rescan Environmental Services and the Tahltan Nation Development Corporation.
About Eagle Plains
Eagle Plains Resources continues to conduct research, acquisition and exploration projects in western Canada. The Company controls over 30 gold and base-metal projects, many of which are currently optioned to or joint-ventured with third parties including NovaGold Inc., Amarc Resources Ltd. (a Hunter-Dickinson Company), Northern Continental Resources Inc., Shoshone Silver Mining Co., and Golden Cariboo Resources Inc. These agreements expose Eagle Plains to over $18 million in exploration expenditures by its partners over the next five years. In recent years, Eagle Plains has completed option agreements with Billiton Metals, Rio Algom Exploration, Kennecott Exploration, Viceroy Resource Corp. and numerous other junior exploration companies, resulting in over 18,000m (60,000 ft) of drilling and over $6,000,000 in exploration spending on its projects since 1998. Over $3.5 million in exploration spending is expected on the company's properties during 2005.
On behalf of the Board of Directors
Signed
"Tim J. Termuende"
Tim J. Termuende, P.Geo. President and CEO
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.
Distributed by Filing Services Canada and retransmitted by Market Wire
For further information, please contact: Andy Schwab (800) 537-4099 Email: info@eagleplains.ca Website: http://www.eagleplains.ca
- 5 Rules for Immediate Annuities
- Death in the Family: 12 Things to Do Now
- Dumbest Things You Do With Your Money
- 6 Online Networking Mistakes to Avoid
- 401(k) Mistakes to Avoid
- 5 Economic Scenarios to Keep You Up at Night
- The Real ‘Best Places to Retire’
- Best Credit Cards for You
- 12 Tough Questions to Ask Your Parents
- The Real ‘Best Colleges’
- Home Buyer Tax Credit: How to Cash In
- Why You Shouldn't Bash Cash
- 8 Phony 'Bargains' and Better Alternatives
- Danger: 3 Debit Card Scams to Avoid
- 6 Myths About Gas Mileage
- 29 Fees We Hate Most
- Quick and Easy Ways to Boost Returns
- Best Stocks to Buy Now
- Lower Your Taxes: 10 Moves to Make Now
- New Jobs: 8 Lessons from Real-Life Career Switchers
- The New Job Market: Who Wins and Who Loses?
- Health Care Reform's Public Option: Everything You Need to Know
- Volunteer Work When Unemployed: Should You Work for Free?
- Whose Recovery Is This?
- Long-Term-Care Insurance: 4 Biggest Risks to Avoid
Content provided in partnership with
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- LIFO vs. FIFO: a return to the basics
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article
- Design a commission plan that drives sales - Sales Commissions


