Aurizon Reports Further Results From Its Joanna Property Including 3.1 Grams of Gold Over 51.2 Metres and 4.7 Grams of Gold Over 29.5 Metres

Market Wire, April, 2008

Aurizon Mines Ltd. (TSX: ARZ)(AMEX: AZK) is pleased to announce additional drill results from the East Block of its Joanna project, located 20 kilometres from Rouyn-Noranda, in north-western, Quebec.

To date, one hundred and eighty six (186) holes totalling 70,980 meters have been completed by Aurizon at Joanna with the objective of confirming results from previous drilling and to extend the lateral extension of the mineralized zones. Results from one hundred and thirty four (134) holes have been received to date, with results from the most recent twenty four (24) holes reported herein.

Infill drilling

Two holes, JA-139 and JA-93, returned respectively, 4.7 grams of gold per tonne over 29.5 metres including 60.5 grams of gold per tonne over 1.2 metres, and 3.1 grams of gold per tonne over 51.2 metres including 63.8 grams of gold per tonne over 1.4 metres.



                            JOANNA - EAST BLOCK
                            Surface Infill 2008
-------------------------------------------------------------------------
                                                                   Length
             East    North     From       To    Gold Grade True thickness
Hole      (metres) (metres) (metres) (metres) (grams/tonne)       (metres)
-------------------------------------------------------------------------
JA-93        8500     1491    115.5    169.5           3.1           51.2
-------------------------------------------------------------------------
including                     153.0    154.5          63.8            1.4
-------------------------------------------------------------------------
JA-139       7325     1382     66.0     96.0           4.7           29.5
-------------------------------------------------------------------------
including                      80.0     81.2          60.5            1.2
-------------------------------------------------------------------------

Additional holes, with greater than 1.0 gram per tonne over a true thickness of 24 metres, are as follows:


                            JOANNA - EAST BLOCK
                            Surface Infill 2008
-------------------------------------------------------------------------
                                                                   Length
             East    North     From       To    Gold Grade True thickness
Hole      (metres) (metres) (metres) (metres) (grams/tonne)       (metres)
-------------------------------------------------------------------------
JA-88        8625     1564    103.5    132.0           1.4           25.8
-------------------------------------------------------------------------
JA-104       8850     1507    118.5    144.0           2.1           24.1
-------------------------------------------------------------------------
JA-111       8800     1507    136.5    165.0           1.3           24.6
-------------------------------------------------------------------------
JA-112       8475     1519     88.5    117.0           1.1           24.5
-------------------------------------------------------------------------
JA-112       8475     1519    163.5    193.5           1.4           26.0
-------------------------------------------------------------------------
JA-116       8625     1499    102.0    129.0           1.1           26.5
-------------------------------------------------------------------------
JA-117       8850     1508    144.0    189.0           1.4           36.5
-------------------------------------------------------------------------
JA-129       8600     1644    166.5      195           1.9           26.9
-------------------------------------------------------------------------

Effective as of September, 2007, mineral resources at Joanna are estimated at 11.3 million tonnes averaging 1.7 grams of gold per tonne, or 630,000 ounces in the indicated mineral resource category and 28.6 million tonnes averaging 1.6 grams of gold per tonne, for 1.42 million ounces in the inferred mineral resource category. Details of key assumptions, parameters and methods used to estimate the mineral resources and other information required by National Instrument 43-101 is included in the Technical Report - Resource modeling & estimation update - Joanna Gold deposit, dated October 26, 2007, filed under the Company's profile on www.sedar.com .

Work in Progress

- A preliminary technical assessment report which will focus only on the mineral resources referred to above, which are located in the upper part of the East block, above the 200 metre level, is in the final stages of completion.

- Four rigs are currently active on the property, conducting infill drilling within the East block existing mineral resource contour and along its lateral extension. Drilling is being performed on 100 metre spacing, 1,600 metres west of the known indicated mineral resources and 450 metres to the east. Assays are pending on fifty two (52) holes. The results of this infill drilling program will be integrated into an updated mineral resource estimate later this year.

- Five holes have been completed recently along the dip extension of the East block to test high grade enrichment below the 500 metre level. Assays are pending.


 

BNET TalkbackShare your ideas and expertise on this topic

Please add your comment:

  1. You are currently: a Guest |
  2.  

Basic HTML tags that work in comments are: bold (<b></b>), italic (<i></i>), underline (<u></u>), and hyperlink (<a href></a)

advertisement
advertisement
  • Click Here
  • Click Here
  • Click Here
advertisement

Content provided in partnership with Market Wire