Vaaldiam Expands Size of Candle Lake Kimberlite Pipe
Market Wire, May, 2008
Vaaldiam Resources Ltd. ("the Company") (TSX: VAA) reports the completion of the 2008 delineation drilling program on its 100% owned Candle Lake C29/30 kimberlite pipe. The estimated 70 hectare kimberlite is situated in the northern end of the Fort a la Corne Kimberlite Field in central Saskatchewan. A total of 21 coreholes totaling 4,700.65 metres were completed as part of a previous delineation program that started in late 2006 and was designed to evaluate the economic potential of this large kimberlite body.
Commenting on the results of this latest program, Brent Jellicoe, VP Exploration and Evaluation said that "our recent delineation drilling program has successfully expanded the margins of the pipe which should result in an increase in kimberlite tonnage. The core drilling that was completed indicates that the kimberlite beds are thicker than previously thought, and that the kimberlite forms a more continuous tabular body than what was interpreted previously."
A total of 937 kilograms of kimberlite has been submitted for full diamond recovery to a bottom screen size of 0.106 mm using caustic dissolution methods at the Saskatchewan Research Council (SRC) Geoanalytical Lab in Saskatoon. These microdiamond results will supplement the current database of diamond results, which will be further supplemented with macrodiamond recoveries from the 2007 minibulk samples that are expected to be released later this month. Combined, these results will support diamond grade forecasts with a higher degree of confidence. These studies will contribute to an in-house Conceptual Mine Study that will provide information to determine whether to proceed with a 43-101 compliant inferred resource calculation.
The following tables provide a summary of the drilling completed on the C29/30 kimberlite.
Table 1: Summary of 2008 Core Drilling on the South Lobe
of the C29/30 Kimberlite
------------------------------------------------------------
Top of Total
Corehole Kimberlite Kimberlite Kimberlite End of
Identifier Lobe (m) (m) Hole (m)
------------------------------------------------------------
CL-08-005 South 159.31 21.11 201.16
------------------------------------------------------------
CL-08-006 South 164.59 9.45 194.77
------------------------------------------------------------
CL-08-007 South 155.05 36.67 200.86
------------------------------------------------------------
CL-08-008 South 155.05 94.58 249.63
------------------------------------------------------------
CL-08-009 South - - 197.51
------------------------------------------------------------
CL-08-010 South 151.88 116.04 277.67
------------------------------------------------------------
CL-08-011 South 149.05 92.74 252.98
------------------------------------------------------------
CL-08-012 South 152.85 44.97 206.96
------------------------------------------------------------
CL-08-013 South 156.11 78.07 243.84
------------------------------------------------------------
CL-08-014 South 156.17 62.26 219.21
------------------------------------------------------------
CL-08-018 South 153.09 31.27 197.81
------------------------------------------------------------
Total: 587.16 2,442.40
------------------------------------------------------------
Table 2: Summary of 2008 Core Drilling on the North Lobe and
Central Area of the C29/30 Kimberlite
------------------------------------------------------------
Top of Total
Corehole Kimberlite Kimberlite Kimberlite End of
Identifier Lobe (m) (m) Hole (m)
------------------------------------------------------------
CL-08-001 Central 148.74 30.39 188.97
------------------------------------------------------------
CL-08-002 Central 161.70 12.18 180.59
------------------------------------------------------------
CL-08-003 Central 170.40 68.26 242.32
------------------------------------------------------------
CL-08-004 Central - - 240.79
------------------------------------------------------------
CL-08-015 Central 177.65 60.02 246.58
------------------------------------------------------------
CL-08-016 North 162.08 99.74 264.87
------------------------------------------------------------
CL-08-017 North 155.54 54.56 219.15
------------------------------------------------------------
CL-08-019 North 152.07 76.96 231.34
------------------------------------------------------------
CL-08-020 North 154.53 55.38 213.36
------------------------------------------------------------
Cl-08-021 North 153.92 71.33 230.28
------------------------------------------------------------
Total: 528.82 2,258.25
------------------------------------------------------------
- 5 Rules for Immediate Annuities
- Death in the Family: 12 Things to Do Now
- Dumbest Things You Do With Your Money
- 6 Online Networking Mistakes to Avoid
- 401(k) Mistakes to Avoid
- 5 Economic Scenarios to Keep You Up at Night
- The Real ‘Best Places to Retire’
- Best Credit Cards for You
- 12 Tough Questions to Ask Your Parents
- The Real ‘Best Colleges’
- Home Buyer Tax Credit: How to Cash In
- Why You Shouldn't Bash Cash
- 8 Phony 'Bargains' and Better Alternatives
- Danger: 3 Debit Card Scams to Avoid
- 6 Myths About Gas Mileage
- 29 Fees We Hate Most
- Quick and Easy Ways to Boost Returns
- Best Stocks to Buy Now
- Lower Your Taxes: 10 Moves to Make Now
- New Jobs: 8 Lessons from Real-Life Career Switchers
- The New Job Market: Who Wins and Who Loses?
- Health Care Reform's Public Option: Everything You Need to Know
- Volunteer Work When Unemployed: Should You Work for Free?
- Whose Recovery Is This?
- Long-Term-Care Insurance: 4 Biggest Risks to Avoid
Content provided in partnership with
Most Recent Business Articles
- CORRECTION FROM SOURCE/Media Advisory: Fallen Canadian Soldiers and Journalist Return Home
- Fox Networks Group and Bright House Networks Strike Comprehensive Deal to Distribute Fox Broadcast Stations, National Cable and Regional Sports Networks
- Fox Networks Group and Time Warner Cable Strike Comprehensive Deal to Distribute Fox Broadcast Stations, National Cable and Regional Sports Networks
- Houston Radio D.J. Kevin Kline Completes 500-Mile, 13-Day Ultramarathon Across Texas for Kids with Cancer
- Seaspan Corporation Provides Information on the CSCL Hamburg
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- LIFO vs. FIFO: a return to the basics
- Using object-oriented analysis and design over traditional structured analysis and design
- Design a commission plan that drives sales - Sales Commissions



