Edmonton bridges the gap
Summit, Jan/Feb 2005 by AbouRizk, S, Siu, K L, Allouche, M
A risk analysis approach to the municipal infrastructure gap
THE CITY OF EDMONTON has worked aggressively to address its infrastructure gap, developing an infrastructure strategy in 1998 and, in 2000, establishing an Office of Infrastructure to develop strategies and tools to deal with the gap. One such tool, highlighted in this article, is the prioritization of funding based on analysis of the risk associated with different potential failures amongst varying asset classes.
Edmonton's infrastructure gap is too large to reduce over a short period of time, therefore, to decrease the gap, a long-term strategy must be implemented. Given the shortage of funding necessary to make all infrastructure upgrades and repairs, spending priorities must be established. For example, decisions must be made regarding questions such as "Should $ 10 million be used to fund swimming pools, hockey arenas, roads or sewers," and "how much money is needed to fix those assets that are failing or expected to fail?"
The challenge then, was to develop a uniform strategy that dealt with all types of assets, and could answer those and other questions raised by the Office of Infrastructure.
The models developed in the risk analysis make it possible to identify those assets that are considered "critical"... Investment should take place immediately in a "critical" asset to minimize failure and the corresponding impacts of failure. At the same time, it is possible to provide a picture of the investment required to attain various levels of service beyond what is determined critical.
The risk analysis approach is based on a combination of macro lifecycle analysis and standard risk analysis modeling. Life-cycle modeling is well documented in literature, and therefore, only the risk analysis approach will be discussed here.
Risk associated with a given infrastructure element is measured using numerous indicators including: asset severity, portion of assets deemed to be "critical" (i.e., expected to fail), impact of failure of an asset, expected mode of failure, overall condition, portion of the asset in poor condition (i.e., as described by D and F in number 1 below), and others. Some of these parameters are:
1. Overall average condition of the asset: The condition of an asset in this analysis is categorized as either A (very good), B (good), C (fair), D (poor), or F (very poor) as per American Society of Civil Engineers (ASCE) recommendations.
2. Critical assets: This is an indicator of the portion of a given asset (an asset unit) that is theoretically expected to fail. Failure, in this sense, represents those assets that have deteriorated past the expected service life. These assets are considered unacceptable. The portion of assets deemed to be critical are analytically derived based on a deterministic Markovian process (a mathematical analysis of the state of dynamic systems), engineering deterioration properties of the asset and the likelihood of experiencing sudden or anticipated failures for each condition an asset is in.
3. Impact of failure: This is an indicator that details the implication of the failure of an asset unit on the corporation and its value. The impact areas are derived from Plan Edmonton (Edmonton's municipal development plan). Many tables are developed to help managers characterize the impact of failure for a given unit of the asset base (e.g. impact of failure for 1 km of road or pipe on services to people, safety, health, etc.)
4. Severity: This is an indicator of the overall status of an infrastructure element reflecting the overall likelihood of asset failure (or partial failure), the expected amount of failure and the impact the failure would have on the corporation. Severity is an analytical combination of expected assets in critical condition, and the impacts of failure of those assets.
Severity is represented on a "fuzzy scale, as shown in Figure 1, with the following zones:
* Intolerable - An asset measuring "intolerable" represents a totally undesirable situation where the combination of the "expected failure amount" and the impact of each unit of failure is intolerably high.
* Acute - An asset that is considered to be "acute" represents a very undesirable situation where the combination of the expected failure amount and the impact of each unit of failure are considered to be too high to accept.
* Serious - An asset that is considered to be "serious" represents an undesirable situation where the combination of the "expected failure amount" and the impact of each unit of failure is considered to be high enough to warrant attention.
* Important - An asset that is considered to be "important" represents a reasonable level of risk. It implies a situation where the combination of the "expected failure amount" and the impact of each unit of failure are considered to be in a manageable state.
* Acceptable - An asset that is considered to be "acceptable" represents a low level of risk. It implies a situation where the combination of the "expected failure amount" and the impact of each unit of failure are considered to be low.
- 5 Rules for Immediate Annuities
- Death in the Family: 12 Things to Do Now
- Dumbest Things You Do With Your Money
- 6 Online Networking Mistakes to Avoid
- 401(k) Mistakes to Avoid
- 5 Economic Scenarios to Keep You Up at Night
- The Real ‘Best Places to Retire’
- Best Credit Cards for You
- 12 Tough Questions to Ask Your Parents
- The Real ‘Best Colleges’
- Home Buyer Tax Credit: How to Cash In
- Why You Shouldn't Bash Cash
- 8 Phony 'Bargains' and Better Alternatives
- Danger: 3 Debit Card Scams to Avoid
- 6 Myths About Gas Mileage
- 29 Fees We Hate Most
- Quick and Easy Ways to Boost Returns
- Best Stocks to Buy Now
- Lower Your Taxes: 10 Moves to Make Now
- New Jobs: 8 Lessons from Real-Life Career Switchers
- The New Job Market: Who Wins and Who Loses?
- Health Care Reform's Public Option: Everything You Need to Know
- Volunteer Work When Unemployed: Should You Work for Free?
- Whose Recovery Is This?
- Long-Term-Care Insurance: 4 Biggest Risks to Avoid
Content provided in partnership with
Most Recent Reference Articles
- A Maryland state trooper gave Erik Bonstrom an $80 ticket for driving too slowly
- In California, postal worker Dean Hudson has been found guilty
- Alec Loorz, the 15-year-old founder of Kids vs. Global Warming and recent Brower Youth Award recipient, went to Congress in November for a press conference with Senators Barbara Boxer and John Kerry, who are championing legislation to stabilize US greenho
- Foreign exchange
- The buzz on bees
Most Recent Reference Publications
Most Popular Reference Articles
- Credit card debt on college campuses: causes, consequences, and solutions
- 9 questions to ask your new lover: what you were afraid to ask, but always wanted to know
- How Tyler Perry rose from homelessness to a $5 million mansion
- Rejoice anyway - Zephaniah 3:14-20, Philippians 4:4-7 - Living by the Word - Column
- Living by the word