AROUND THE COUNTY
Orange County Business Journal, Aug 13-Aug 19, 2007 by O'Hare, Billy, Hughes, Paul
Projects, developments and other activity in cities across OC
Around The County
ANAHElM
Demolition of a 200,000-square-foot industrial building is under way in the second part of a Brookfield Homes Corp. housing project. Models are going up in the first phase of the project.
Harmony at Colony Park and Legacy at Colony Park call for 339 townhomes, expected to sell from the high $300,000s to mid $600,000s. The homes are one to three stories with up to four bedrooms. The project is Del Mar-based Brookfield's latest infill project in Anaheim. It has three more planned for 2008. Colony Park is part of the city's redevelopment of the historic area where the German winemaking founders of Anaheim settled in 1857.
GARDEN GROVE
Developer Empire Homes is ready to start construction of a housing project, Arezzo. The gated community is set to have 144 townhomes ranging from 1,332 to 1,579 square feet. The homes will have two or three bedrooms and two-car garages. The developer hopes to break ground later this year or early next year. The homes are set to replace some 100 apartments set for demolition. Homes are expected to start in the high $400,000s, but the slowing housing market could change that, according to the developer, No word yet on a completion date.
TUSTIN
Construction is under way at Coventry Court, a senior condominium project at the former Marine base. Lennar Corp. is developing the project. The 240-condo complex will have 10 three-story buildings with 24 homes in each building. The condos are set to be one and two bedrooms ranging from 692 to 1,838 square feet. Plans call for a recreation center with a pool, spa and clubhouse. About half of the apartments are set to be affordable based on income. Lennar hasn't set prices yet for the homes. Coventry Court is set to open in early 2008.
FULLERTON
Virginia's Sunrise Senior Living Inc. is well under way on Sunrise of Fullerton, a 48,000-square-foot senior housing project. The complex is set to have 68 rooms for seniors who need help with daily activities. The project, on Euclid Street, is set to open this November.
FOUNTAIN VALLEY
The Orange County Water District broke ground last week at its Advanced Water Quality Assurance Laboratory on Ward Street, off Ellis Avenue. The 34,000-square-foot water treatment facility and office building is expected to cost about $22 million. The building will use recycled construction materials and feature high-efficiency climate control for a smaller impact on the environment, according to contractor FTR International. Plans call for 15 labs to test the county's groundwater supply, which accounts for about 70% of North and Central County's water. The facility, which will house about 30 chemists and 10 quality monitors, will replace a 32-year-old building that didn't meet safety requirements and was too small. Construction is expected to wrap up in early 2009.
- 5 Rules for Immediate Annuities
- Death in the Family: 12 Things to Do Now
- Dumbest Things You Do With Your Money
- 6 Online Networking Mistakes to Avoid
- 401(k) Mistakes to Avoid
- 5 Economic Scenarios to Keep You Up at Night
- The Real ‘Best Places to Retire’
- Best Credit Cards for You
- 12 Tough Questions to Ask Your Parents
- The Real ‘Best Colleges’
- Home Buyer Tax Credit: How to Cash In
- Why You Shouldn't Bash Cash
- 8 Phony 'Bargains' and Better Alternatives
- Danger: 3 Debit Card Scams to Avoid
- 6 Myths About Gas Mileage
- 29 Fees We Hate Most
- Quick and Easy Ways to Boost Returns
- Best Stocks to Buy Now
- Lower Your Taxes: 10 Moves to Make Now
- New Jobs: 8 Lessons from Real-Life Career Switchers
- The New Job Market: Who Wins and Who Loses?
- Health Care Reform's Public Option: Everything You Need to Know
- Volunteer Work When Unemployed: Should You Work for Free?
- Whose Recovery Is This?
- Long-Term-Care Insurance: 4 Biggest Risks to Avoid
Content provided in partnership with
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- LIFO vs. FIFO: a return to the basics
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article
- Design a commission plan that drives sales - Sales Commissions



