Energy Industry
Industry: Email Alert RSS FeedTransmission
Power, Sep 2006 by Stanton, Jim
face= Bold; Mandatory reliability rules are coming. Are you ready to comply?face=-Bold;
An extremely reliable North American bulk power system--one that consistently delivers uninterrupted power to every user--is not a dream that must be made reality. To a large extent, that is what we have today. With the exception of infrequent (and therefore, newsworthy) outages, the system has never been more dependable. Nevertheless, with the great northeast blackout of August 14, 2003, still fresh in memory, Congress saw fit to include electric reliability measures in the Energy Policy Act of 2005.
face= Italic; "I think the biggest, most seismic change is going to come from mandatory reliability rules."--FERC Commissioner Nora Brownellface=-Italic;
Most RecentEnergy Articles
The Energy Policy Act of 2005 (EPAct) created a new regulatory entity--called the Electric Reliability Organization (ERO)--and made it responsible for defining and regulating the overall U.S. electricity transmission grid. As for oversight, EPAct states that "The [Federal Energy Regulatory] Commission shall have jurisdiction, within the U.S., over the ERO, any regional entities, and all users, owners and operators of the bulk-power system . . . for purposes of approving reliability standards . . . and enforcing compliance."
The key responsibility of the ERO is to set reliability standards for the national grid that will be mandatory, enforceable, and applicable to all "users of the bulk electric system." Entities that fail to comply with the standards and associated measures will incur monetary penalties and other possible sanctions. Because ignorance of the law is no excuse, here's a short course on transmission reliability that should help keep you out of hot water.
face= Bold; New sheriff in townface=-Bold;
Established in June 1968--31 months after a widespread blackout left 30 million residents of eight northeast states and Ontario without power for as long as 13 hours--the North American Electric Reliability Council (NERC):
Develops and enforces voluntary reliability standards.
Monitors the bulk power system and assesses its future adequacy.
Audits owners, operators, and users for preparedness and educates and trains industry personnel.
NERC is a self-regulating organization that relies on the diversity and collective expertise of members of the electric power industry. It has worked over the years with a small staff and legions of volunteers to draft voluntary policies addressing reliability concerns and to develop new measures to keep up with the ever-increasing power needs of North America. Constantly refined and expanded over the years, NERC's procedures and standards have served the continent's bulk power system well, but they were voluntary requirements. Peer pressure and public notice of violations were considered sufficient incentives to ensure reasonable compliance.
Clearly, the drafters of EPAct and the legislators who voted for it felt that voluntary compliance was no longer acceptable. As a result, reliability standards and associated measures developed under the auspices of the ERO soon will carry the weight and penalty of federal law.
In 2003, NERC took the historic step of becoming a standards-setting organization accredited by the American National Standards Institute (ANSI). ANSI's requirements ensure that NERC standards are developed in a fair, open, balanced, and inclusive manner; that all industry stakeholders are afforded the opportunity to participate in the process; and that all comments for and against proposed new standards and their provisions are responded to in a public forum by the people who have drafted them.
NERC's current operating policies and planning standards were put through this process. Now, new standards are being developed to address new concerns that have emerged in recent years. Two that bear directly on issues related to the blackout of August 14, 2003, are the Cyber Security Standard and the System Personnel Training Standard. As required by the ANSI process, each phase of development--from the initial Standard Authorization Request to posting of the standard's language and the request for comments and balloting--is transparent. Anyone interested in the details can visit https://standards.nerc.net/
face= Bold; Fairer to allface=-Bold;
NERC was named the first ERO on July 20, 2006 (see box). It has the infrastructure in place to fulfill the responsibilities of an ERO, and it has been aligning its operations to prepare for its new duties for many months. EPAct defined the ERO's corporate structure, governance, bylaws, and procedures in great detail. It also clearly delineated the authorities and responsibilities of the ERO; NERC's eight regional reliability councils; and the bulk power system owners, operators, and users that fall under the ERO's jurisdiction.
NERC's assumption of the duties of the ERO is a big step forward for all stakeholders in the electric power industry. Although NERC's standards-setting process always has been fairly open, smaller users of the bulk power system--cooperatives, municipal utilities, power marketers, and independent power producers--often lacked the resources to devote to the numerous subcommittees, working groups, and task forces charged with evaluating and developing reliability requirements. As a result, the concerns of commercial stakeholders and other minority interests, who often saw business agendas embedded in the standards, were routinely ignored. That paradigm of exclusivity has been rectified to a large extent by the open process now mandated by NERC and ANSI, and by the addition of Federal Energy Regulatory Commission (FERC) oversight.
- How to choose the right insurance carrier for your business
- Real Estate: Prepare your properties to weather what lies ahead
- Technology: Be prepared if part of your global supply chain goes missing
Most Recent Business Articles
- Multiple criteria evaluation and optimization of transportation systems
- Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
- A two-leveled multi-objective symbiotic evolutionary algorithm for the hub and spoke location problem
- Multi-criteria analysis for evaluating the impacts of intelligent speed adaptation
- The development of Taiwan arterial traffic-adaptive signal control system and its field test: a Taiwan experience
Most Recent Business Publications
Most Popular Business Articles
- 7 tips for effective listening: productive listening does not occur naturally. It requires hard work and practice - Back To Basics - effective listening is a crucial skill for internal auditors
- FAS 109: a primer for non-accountants - Financial Accounting Standards Board's "Statement 109: Accounting for Income Taxes"
- LIFO vs. FIFO: a return to the basics
- Too Young to Rent a Car? - 25-years-old the minimum age for car renting - Brief Article
- Design a commission plan that drives sales - Sales Commissions



